Manchester Road Reopens

Ariel View

A57 Manchester Road in both directions has re-opened. The Road had been closed due to a turned-over fuel tanker blocking the road near to Blackbrook Farm.

So every picture ‘T’ells a story, In these is T for Tanker and T for thankfully no-one was hurt. I’d driven past this point earlier and the road was sheet ice, I managed to slide my car round keeping roughly straight ahead and not spinning or crashing.

Tanker on its side (Mike Smith)

I drove through about 8am, and the water run-off from the meadows above was hitting the road and freezing causing sheet ice all across the bends. But the following story is even more interesting! The silver car had lost control and crashed first, I spoke to the Slovakian couple who were in it, and this is what I learned. They had crashed after sliding on the ice, busted the front wheel and ended up where they are seen ‘parked.’

Tanker A57 (Mike Smith)

Then they were walking away from the accident towards us a couple of minutes later, when the LPG tanker driver lost control on the ice and ‘fish-tailed’ it until the liquid gas sloshed about and caused it to turn over. As the tanker was careering towards where it ended up, the couple saw it coming towards them and literally ran for their lives. The tanker then crashed and the driver couldn’t get out! The slovakian man ran to help and offered to break the windscreen with a hammer “OOOH no the driver said, we can’t risk a spark” and kicked his way out to safety. This was 9.20am GMT and the recovery and emergency service finally righted it about 14.45GMT.

Thankfully no one was hurt and if they had been I wouldn’t have posted any shots.
 Mike Smith

Manchester Road Blocked

Please avoid Manchester Road for the time being.

Due to a collision involving a fuel tanker, which occurred this morning (Sunday 27th February), near to the Black Brook Farm on the A57, the Manchester Road was blocked by the Police near to the Bell Hagg Garden Centre.

Bell Hagg Garden Centre remains open.

South Yorkshire Fire & Rescue is presently dealing with the situation.

Snake Pass Closed

A landslip following storms closes A57 Snake Pass

Snake Pass

In the interests of everyone’s safety, following damage caused by torrential rain as Storm Eunice and then Storm Franklin battered Derbyshire; the A57 Snake Pass has had to be closed.

Inspectors found movement in 3 locations along a mile-long section of the road and to protect road users a decision was made to close the road between Glossop and Ladybower Reservoir for at least a month. Visitor facilities at Fairholmes are unaffected and can be accessed via Sheffield.

In the meantime, local access will be maintained for residents. Drivers are asked to follow the diversion route through Hathersage, Hope, Doveholes, Whaley Bridge, New Mills, Hayfield and Glossop, and visa versa.

St Columba’s Church Update

St. Columba’s Church hosted a mop-up Covid vaccination clinic for the Children’s Hospital on Monday 14th February and another for the Primary Care Network on the morning of Wednesday 16th

St Columba’s Church, Crosspool,

NHS England are funding necessary renovations to the wood block flooring in both the worship area and the hall, which have been severely affected during the year’s vaccination programme, partly due to the substantial footfall (over 50,000 vaccinations have been given on site), but mainly due to the requirement to sanitise all the wood flooring using chlorine solution after every day’s clinic (just short of 100 days).  In terms of cost, it is worth pointing out that the renovation cost added to the total charges made by the church to the NHS for a year’s exclusive use of the site, still come to less than the Arena were charging for one month’s hire for the vaccination programme (this is not to knock the Arena which works on a commercial and larger scale than they do, but to put things in context).

However, the worship area is also in need of re-decoration, which the Church has budgeted for, and this must be done prior to the floor repairs as it entails the use of tower scaffolding on the floor.

Work starts on 22nd February, and they expect all to be finished by the end of March.  All groups who use the church have been kept informed, and most are anxious to return after Easter, whilst the leadership team will discuss how they harmonise Sunday services and church activities when they again have two fully operational church sites.

St Columba’s Church Service

Having developed such good relations with both the community and the medical team in 2021, they will continue to offer occasional use for clinics in the future, and are able to do so as the requirements for sanitising, particularly of the flooring, have been relaxed, so further damage can be avoided.  They also intend to have a service of thanksgiving where they invite community volunteers and medical staff to join them and are looking at other ways to build on links made during the last two years.

Steve Ellis (St. Columba) said, “it has been a privilege to work with all in the community and the medical teams whose commitment and dedication has been inspiring.  The church community as a whole need especial thanks, not just those directly involved in the practicalities of supporting both the vaccines and the Community Volunteer Hub, for their positive support, encouragement and prayer during the pandemic”.

Heart of Crosspool

“love”

Spreading the love since 2018!
The Ivy Heart of Crosspool currently displays “love” in lights! “Happy Valentine’s”

Scott Barton, the original person to shape the Ivy Heart on the wall of the Hallam football/cricket club wall on Sandygate Road said, “Having driven past the ivy more than once, it struck me that with a bit of trimming it could be turned into a heart. I roped in my pal, Ian Knowles who lives nearby, and did the original trim on Christmas Eve 2018, in the hope that it would make people smile.”

Hearts of Crosspool

When, on Valentine’s night 2019, it was all lit up with red lights, Jenny Hill and her hubby noticed the Ivy Heart and thought how lovely it looked and stopped to take a photo. Then through the pandemic lockdowns, thinking it really needed some love, Jenny contacted Scott, and they set about sprucing it up, giving it some new lights and a positive “Chin up!!

Since then Jenny, joined by her very creative friend Jo and her mum Anne, have had such fun creating every one of the twelve-plus seasonal heart changes they have fashioned up to now.

Jenny, Jo & Anne, love looking after the ivy heart and really appreciate all the wonderful Compliments, Thumbs-ups, Hoots and Smiles people give as they go past!

Crosspool Tavern Carpark CCTV

CCTV sign
CCTV

For the security and convenience of customers, the Crosspool Tavern has installed CCTV in their Carpark.
This change is to improve the availability of car park spaces for customers.

When parking in the Crosspool Tavern car park, guests must register their full and correct vehicle registration details via the console in the pub.

Crosspool 20mph Speed Limit

Speed Limit

Sheffield City Council proposes to make an Order under the provisions of Section 84 and Schedule 9 of the Road Traffic Regulation Act 1984, to introduce a 20mph speed limit on the whole or on parts of every road in Crosspool and the surrounding area. Exceptions are Lydgate Lane, Manchester Road and Sandygate Road from the junction of Ringstead Crescent near to the shopping precinct.

The proposed 20mph speed limit is required to control vehicle speeds in the residential streets of the Crosspool area where we live, work, play & shop.

A copy of the proposed plans showing the roads affected and a statement of the Council’s reasons for proposing to make the Order may be inspected in “Proposed Traffic Orders” on the Council website at https://www.sheffield.gov.uk/home/roads-pavements/covid-19-Traffic-orders

Any observations, either supporting or objecting to the proposed Order, including the grounds for your objection, should be sent in writing to the undersigned by the 3rd day of March 2022.

Tom Finnegan-Smith, Head of Strategic Transport, Sustainability and Infrastructure City Growth Department,
Howden House, 1 Union Street, SHEFFIELD, S1 2SH
Email: traffic.regs@shef